In Palm Beach, Broward and Miami Dade, pick a landscape subcontractor who installs, documents the work and stays on to maintain the site until turnover. That closes the gap where plants die between install and handoff, helps the punch list close on schedule, and gives the owner’s rep fewer landscaping reasons to call you.
Landscape is the last trade on site, so every earlier delay shrinks its window. It is also the first thing the owner’s rep sees on the walk. If the sod is patchy or a hedge is missing when your final payment is waiting, the landscape sub decides how your closeout ends. These seven items are what to line up before that walk.
1. A landscape installer with its own production team
You want the people who bid the work to be the people who do it, because passing landscaping down to another sub is how plan mismatches and missed dates start. Green Image is a commercial landscape company that has maintained and installed landscapes on commercial properties across Palm Beach, Broward and Miami Dade for 14 years. For a GC, that covers landscape installation, sod, tree installation, hardscape and drainage under one company.
Green Image installs with an assigned production team whenever practical, and a supervisor oversees the work. That gives you one company to hold to the plan instead of a chain of handoffs. Our commercial landscape installation page lists the scope in detail.
2. Sleeves, drainage and grade confirmed before planting and sod
Sod and plants go in over whatever is underneath, so problems found afterward mean tearing up finished work. Before planting starts, walk these with the landscape sub:
- Irrigation sleeves sit where the beds are drawn, before paving closes them off.
- Irrigation heads and zones are in place and tested before sod goes down.
- Drainage correction, such as area drains, catch basins or downspout drainage, is in and draining.
- Final grade matches the plans at the curbs, walls and walks.
The rainy season in South Florida moves sod and planting dates, so build that into the schedule instead of absorbing it at the end. The building department and the architect’s plans decide what the landscape inspection requires for final approval in your jurisdiction. Ask them, and confirm the answer with your sub early.
For general contractors: our free GC Field Guide to Selecting a Landscaper covers what to check before you hire a landscape sub. Get the free guide
3. A named plan for plant care between install and turnover
Plants installed weeks before turnover still need watering and care until the owner’s maintenance starts. That gap is where plants die, and it is where the owner’s rep ends up calling you. A sub that also maintains the site closes the gap, because the company that planted is already responsible for what happens next.
Ask for the plan in writing, so nobody guesses after the plants are in:
- Who waters, and on what schedule.
- Who checks the irrigation zones.
- Who reports what they see, and to whom.
4. Plant substitutions approved in writing before install
South Florida nursery stock changes by season and supplier, so the plant on the plans is sometimes not the plant on the truck. A good sub flags the substitution before install and gets approval in writing from the project team. Treat it as a closeout item. When the owner’s rep asks why the entrance plants look different from the drawings, you hand over the approval instead of arguing from memory.
5. Job logs and photos for the closeout file
The owner’s rep and your project executive both ask what was done and when, so the answer has to be on paper. Ask the landscape sub for:
- The job log for the work.
- Visit photos.
- An as installed plant list.
Green Image documents work according to the agreed reporting plan, so agree on that plan at the start. Our sample daily job log shows the kind of record to expect.
6. One point of contact for the punch list
When the punch list comes back, you need one person who answers your call and owns the fixes. Green Image gives you one point of contact. Our approach to working with general contractors starts with a walk of the site and a clear scope, so punch items trace back to something written down.
7. A handoff to maintenance with no new vendor on day one
The day after the owner takes the building, someone has to water, mow and watch the plants you just installed. If that is a new vendor who never saw the install, the learning curve lands on your finished landscape. With Green Image, weekly visits in the growing season and every other week the rest of the year carry on with the same company that installed the work.
For a look at this handoff on a real project, see the Boca Raton custom home builder landscape partnership. Green Image works with around 100 commercial properties across Palm Beach, Broward and Miami Dade, and that experience shapes how we schedule around the rainy season.
FAQ
Why does the landscape sub decide how my closeout ends?
Landscape is the last scope on site and the first thing the owner’s rep sees. An unfinished or dying landscape becomes the open item that holds up your final payment.
Who waters the plants between install and turnover?
It should be named in writing before install. A sub that installs and maintains handles it as part of one scope.
What closeout paperwork should I collect from the landscape sub?
Collect the job log, visit photos and the as installed plant list, documented according to the agreed reporting plan.
What happens to the landscape after the owner takes the building?
With Green Image, maintenance visits continue with the same company, weekly in the growing season and every other week the rest of the year.